Morrison Collection: 2: Jekko Falls Hydro Electric Scheme : Pts 3 & 4 1937-1938
This film is held by the British Empire & Commonwealth Museum (ID: 2001/079/002).
Synopsis
Reels 1 and 2 of the Morrison Collection show the whole of the construction of the Jekko Falls Hydro Electric Scheme from beginning to end, including shifting earth, rocks etc., drilling, building the foundations of the dam, bringing in heavy machinery, and the installation of the turbines.
Production / Donor Details: The films in the Morrison Collection were shot by William Graham Morrison, who went to Nigeria in 1931 as a civil engineer with the Nigerian Electricity Supply Co. He was the surveyor for the first Hydro Electric Power Station at Jekko Falls, and afterwards worked for ATMN (Amalgamated Tin Mines of Nigeria). Mr. Morrison left Nigeria in 1939 after the outbreak of the Second World War. Films donated by Mrs. Lang Brown, who features in several reels as a small child.
Titles
- Morrison Collection: 2: Jekko Falls Hydro Electric Scheme : Pts 3 & 4 1937-1938 (Archive)
- Series Title:
- Morrison Collection
Technical Data
- Year:
- 1938
- Running Time:
- approx 33m 20s
- Film Gauge (Format):
- 8mm VHS BetaSP
- Sound:
- Mute
- Footage:
- 400ft
Production Credits
- Production Details
- See synopsis